Home   |   Brass Bibcock Valve Series

Brass Bibcock Valve Series

  • Brass Color Male Threaded Connector Brass Taps Brass Bibcock
  • Brass Color Male Threaded Connector Brass Taps Brass Bibcock
  • Brass Color Male Threaded Connector Brass Taps Brass Bibcock
  • Brass Color Male Threaded Connector Brass Taps Brass Bibcock
Brass Color Male Threaded Connector Brass Taps Brass BibcockBrass Color Male Threaded Connector Brass Taps Brass BibcockBrass Color Male Threaded Connector Brass Taps Brass BibcockBrass Color Male Threaded Connector Brass Taps Brass Bibcock

Brass Color Male Threaded Connector Brass Taps Brass Bibcock

  • Brass Requested material
  • Requested Logo
  • OEM Package
  • Good Lead time
  • Product description: Brass Color Male Threaded Connector Brass Taps Brass Bibcock
  • INQUIRY
 
Product Description

Body BRASS: CW614N, CuZn39Pb3, CW617N, CuZn40Pb2, DZR….
Ball Brass , Chrome plated
Stem Brass
Stem Sealing Ring NBR O-RINGS
Gasket PTFE
Handle Aluminum,steel
MM / FM Thread Thread to ISO228/1, BSP, NPT, etc


 

Technical standard:

Norminal Diameter: DN15-DN25, can be customized.

Norminal Pressure: 1.6Mpa.

Working Medium: Water, Non-causticity liquid, Saturated steam

Working Temperature: -20°C≤T≤100°C.

Years of OEM experience.

 

 


Advantages


1) Fast Material Supply.

2) Every valve goes through a six-step QC process before delivery.

Material Control, Machining Quality Control, In-coming Material Inspection, Assembly Line Quality Control, Leakage Testing, Final Inspection Before Delivery.

3) 100% Leakage Test.

4) Strictly and perfect management in production.

5) Guarantee Quality In Competitive Price.

6) On-time Delivery.

7) Complete R&D facilities and Excellent team.

8) Annual R&D projects reach the number of 100.

9) Have rich experience and strong ability to develop new products.


QC:

· We promise to supply you high quality and durable goods for you.

· Our worker will check every accessory before hand-assembled.

· Our quality inspector will check every product one by one before packing.

· Regular checking on line from production in each workshop



Production step :

1) purchasing the material and forged the semi-products .

2) processing the semi-products in workshop .

3) assembling the goods .

4) testing the sealing in pressure and checking quality of the goods

5) package

6) deliveing the goods on time .


Package:


1) the package standard : standart export carton, box .

2) if customer has special requirement. it is available to provide the colorful package against the design of customer.