Home   |   Hot Products

Hot Products

  • Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte
  • Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte
  • Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte
  • Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte
Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre FilteMale Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre FilteMale Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre FilteMale Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte

Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte

  • R200P Raw Material
  • Sizes From 20mm-160mm
  • Dstherm & OEM Brand
  • ISO15874 Standard
  • Product description: Male Threaded Union Brass Body Whole House Washable Pipeline Stainless Steel Mesh Brass Water Pre Filte
  • INQUIRY

 

Ppr Brass Pre-Filter Product: 

Executive Standard QB/T 4143-2014
Capacity 3000 L/H
Model   DSTHERM
Working Temperature Range Maximum: 70°C / 158°F
Minimum: 5°C / 41°F
Working Pressure Maximum: 1.2 MPa
Minimum: 0.1 MPa
Dimensions DN15 DN20 DN25
Weight Net 1.0KG / Gross 1.2KG
Pre Filter body material European standard Brass
Size of filter mesh

30-60μm


Details Image
Application:


Pre-Filter For Drinking



More Details: 

Brand Name DSTHERM / OEM available
Package 1 pc in one poly bag, 10-12 pcs in one white or brown box, 100-120pcs in brown carton, OEM available
Payment Terms T/T 30% in advance, 70% against of copy; L/C 30% in advance, 70% at sight; Western Union; Paypal
Port of Departure Shanghai/ningbo
Place of production Zhejiang
Production Time OEM order 45 days of production including new moulds, Existing products only need 30 -35 days after order confirmation
Applications Threaded On/Off Valves for Water, Oil
Main Material MS58; HPB57-3; HPB59-1; CW617N; CW611N; CZ132(DZR); CW602N(DZR); 
Lead free brass C46500
Size (1/2" DN15; 3/4" DN20; 1" DN25; ), S20*1/2F,S25*3/4F,S32*1F,S40*1-1/4F, S50*1-1/2F,S63*2F
Threaded G (GB/T7307-2001) ; BSP (BS21-1957); BSP.F (BS-2779); BSP.T (BS-1957); NPT (GB/T12716-1991); PT (GB/T7306-2000); (R; Rc; Rp; NPS are available)
M.O.Q. 10 pieces which depends on production arrangement

Advantages


1) Fast Material Supply.

2) Every valve goes through a six-step QC process before delivery.

Material Control, Machining Quality Control, In-coming Material Inspection, Assembly Line Quality Control, Leakage Testing, Final Inspection Before Delivery.

3) 100% Leakage Test.

4) Strictly and perfect management in production.

5) Guarantee Quality In Competitive Price.

6) On-time Delivery.

7) Complete R&D facilities and Excellent team.

8) Annual R&D projects reach the number of 100.

9) Have rich experience and strong ability to develop new products.


QC:

· We promise to supply you high quality and durable goods for you.

· Our worker will check every accessory before hand-assembled.

· Our quality inspector will check every product one by one before packing.

· Regular checking on line from production in each workshop

Production step :

1) purchasing the material and forged the semi-products .

2) processing the semi-products in workshop .

3) assembling the goods .

4) testing the sealing in pressure and checking quality of the goods

5) package

6) deliveing the goods on time .


Package:


1) the package standard : standart export carton, box .

2) if customer has special requirement. it is available to provide the colorful package against the design of customer.